The Project: Sectionalizing Study
Client: City of Dothan (AL) Utilities

The Stats

  • 31,424 customers
  • 10 substations

The Solution

  • Modeled Dothan’s transmission system to produce source impedance data at 10 distribution substation sites
  • Conducted study on most difficult station for coordination 

The Result
Contracted to conduct sectionalizing study on remaining 9 substations