Project:  Suwannee Transmission Line
Client: Central Florida ECI, Chiefland, FL

The Stats
Extend existing 69 kV transmission line 8 miles to new substation site

The Solution

  • Polymer insulators
  • Concrete poles
  • Designed for double circuit distribution underbuild

The Result

  • Line is energized and awaiting substation completion 
  • Overcame defective wire and inexperienced construction contractor